| 1 | Replacement of Technologies & Ended-Lifetime Assets: Al Jubail Desalination Plant Phase 2 (SWA) / Contract 225211500Jubail | Installation & lamination for GRP pipes | METITO | SWCC | SAR 300,000.00 |
| 2 | Expansion of IWTP-8 Stage-4 (DBO)Jubail | Installation of GRP pipes & fittings | Nfoud Al Atheria Co. | MARAFIQ | SAR 1,495,000.00 |
| 3 | Expansion of IWTP-8 Stage 4, Marafiq JubailJubail | Installation of GRE 6" pipes with adhesive jointing; testing & commissioning of underground / aboveground GRE piping | Pioneers Arabia | MARAFIQ | SAR 137,885.00 |
| 4 | Marafiq Expansion of IWTP-8 Stage 4 ProjectJubail | Supply of lamination materials | SSEM | MARAFIQ | SAR 119,235.45 |
| 5 | Expansion of IWTP-8 Stage-4 (DBO)Jubail | Supply of lamination materials | SSEM | MARAFIQ | SAR 199,889.55 |
| 6 | Replacement of Technologies & Ended-Lifetime Assets: Al Jubail Desalination Plant Phase 2 (SWA)Jubail | GRP ISO resin | SSEM | SWA | SAR 127,392.40 |
| 7 | Khobar to Dammam / Jamiah Water Transmission System (WTS) ProjectKhobar | Supply of lamination kit materials | SSEM | SWCC | SAR 55,398.00 |
| 8 | JV Acciona Agua / TawzeaTabuk | Supply and delivery of lamination kit for odour package | Acciona Agua – Tawzea JV | NWC | SAR 50,895.20 |
| 9 | Expansion of IWTP-8 Stage-4 (DBO)Jubail | Supply of GRP lamination material | SSEM | MARAFIQ | SAR 79,235.00 |
| 10 | Marafiq Expansion of IWTP-8 Stage 4 ProjectJubail | Supply of lamination materials | SSEM | MARAFIQ | SAR 33,695.00 |
| 11 | Marafiq Expansion of IWTP-8 Stage 4 ProjectJubail | Supply of materials for GRP lamination works | SSEM | MARAFIQ | SAR 111,297.00 |
| 12 | Replacement of Technologies & Ended-Lifetime Assets: Al Jubail Desalination Plant Phase 2 (SWA)Jubail | GRP pipes & fittings installation and lamination work at site | SSEM | SWCC | SAR 1,840,000.00 |
| 13 | Replacement of Technologies & Ended-Lifetime Assets: Al Jubail Desalination Plant Phase 2 (SWA)Jubail | GRP pipes fit-up & wrap lamination work | SSEM | SWA | SAR 3,680,000.00 |
| 14 | Replacement of Technologies & Ended-Lifetime Assets: Al Jubail Desalination Plant Phase 2 (SWA)Jubail | GRP pipes fit-up & wrap lamination work | SSEM | SWA | SAR 4,600,000.00 |
| 15 | Jeddah Airport 2 Independent Sewage Treatment Plant ProjectJeddah | GRP pipes fit-up & wrap lamination work, NERADA equipment installation, plumbing works, puddle pipe installation | SSEM | Jeddah Althaniya Water Company | SAR 8,300,000.00 |
| 16 | Replacement of Technologies & Ended-Lifetime Assets: Al Jubail Desalination Plant Phase 2 (SWA)Jubail | Hydrotesting activities for GRP pipes | SSEM | SWA | SAR 390,158.20 |
| 17 | Replacement of Technologies & Ended-Lifetime Assets: Al Jubail Desalination Plant Phase 2 (SWA)Jubail | GRP pipes fit-up & wrap lamination work | SSEM | SWA | SAR 3,680,000.00 |
| 18 | Replace of Electrical Equipment at Abqaiq BI-0243Abqaiq | Installation of RTR pipes for OWL and FWL at Aindar-02 | Al Gihaz Contracting | Saudi Aramco | SAR 552,690.00 |
| 19 | Replace of Electrical Equipment at Abqaiq BI-0244Abqaiq | Installation of RTR pipes for OWL and FWL at Aindar-02 | Al Gihaz Contracting | Saudi Aramco | SAR 696,210.00 |
| 20 | Replace of Electrical Equipment at Abqaiq BI-0245Abqaiq | Installation of RTR pipes for OWL and FWL at Aindar-02 | Al Gihaz Contracting | Saudi Aramco | SAR 637,330.00 |
| 21 | Al Fursan 2 Master Plan Project, RiyadhRiyadh | Stormwater and sewage networks, fire water and irrigation networks | Saad S. Al-Saedi & Sons Joint-Liability Co. | National Housing Company | Lump sum |
| 22 | Replacement of Technologies & Ended-Lifetime Assets: Al Jubail Desalination Plant Phase 2 (SWA)Jubail | GRE pipes fit-up & wrap lamination work | SSEM | SWA | SAR 1,092,500.00 |
| 23 | Replacement of Technologies & Ended-Lifetime Assets: Al Jubail Desalination Plant Phase 2 (SWA)Jubail | Service & consultancy, fit-up, butt and wrap lamination of GRE pipes and fittings | SSEM | SWA | SAR 1,638,750.00 |
| 24 | Construction of ±500kV HVDC Madinah–Tabuk Converter StationsMadinah / Tabuk | Electrical works | SSEM | SEC | SAR 10,461,716.75 |
| 25 | Jeddah NesmaJeddah | RTR lamination / adhesive joint | Petrol Vigin Co. | Aramco | SAR 168,000.00 |
| 26 | Replacement of Technologies & Ended-Lifetime Assets: Al Jubail Desalination Plant Phase 2 (SWA) / Contract 225211500Jubail | Installation of GRP piping & hydrotest works | METITO | SWCC | SAR 365,000.00 |
| 27 | Installation of GRP Pipes, Fittings and Pumps for Lift StationJubail | Installation only for pump station mechanical equipment (pumps, pipes, valves and fittings) | Eastern Hoists Gen. Cont. Est. | NWC | SAR 69,000.00 |
| 28 | Marafiq Flow Meter Modification, ExecutionJubail | GRP/GRE piping cutting, fit-up and jointing lamination joint | Alamara Intern. Trad. & Cont. Co. | MARAFIQ | SAR 43,700.00 |
| 29 | Installation of Pipe Fitting and Pumps for Lift StationJubail | Installation of pipe fitting and pumps for lift station | Nfoud Al Atheria Co. | RC | SAR 175,087.50 |
| 30 | Construction of Hajar Expansion CCGT IPPDammam | Execution of underground & aboveground GRP piping, lamination joint, different sizes | Rawabi Specialized Contracting Company | Orascom JV / Hajar Two Electricity Company | SAR 2,293,839.45 |
| 31 | DDP TSP Marafiq Yanbu ShutdownYanbu | GRP pipes installation | EPPM (Tunisian-Saudi Projects Company) | MARAFIQ | SAR 322,469.74 |